End of Line Testing
All units in the mCHILLER series come with a EOLT Report. The End of line testing is performed at the Test Facility at our factory as soon as production has been concluded and includes a full load thermal performance test, thermal imaging of key points, and vibration measurements.
Advantages:
Fully established EOLT-facilities
Full load thermal performance test
Thermal imaging of key points
Vibration measurements